| Project: | ProjectPier |
| Version: | 0.8.7-beta |
| Component: | User interface |
| Category: | bug report |
| Priority: | normal |
| Assigned: | phpfreak |
| Status: | open - assigned |
Jump to:
Description
The calendar shows a 1-day shift. The same happened with 0.86 .
05/01/2011 was not a monday, opposed to the displayed calendar.
This installation is a fresh, new one above RedHat EL5.
| Attachment | Size |
|---|---|
| bug_pp_2.png | 19.6 KB |
Not good. I will investigate.